Rent JUMAG steam systems
JUMAG steam systems are also available for rent. So you are flexible at all times – and you can also take a close look at the JUMAG steam boilers without any obligation.
1.
Send enquiry
2.
Receive advice & offer
3.
Delivery & commissioning within 24 h
Hiring steam systems offers you real advantages
Flexibility.
Adaptation to temporary requirements, scalability
Cost saving.
No high acquisition costs and flexible rental period
Quick availability.
Ready for immediate use, fast delivery and installation.
Our steam rental offers
Steam systems with oil/gas or electric. Multiple, compact, containerised.
The JUMAG rental fleet includes various types of steam systems. Choose between oil/gas, electric or hybrid operation. We have multiple steam systems, compact steam systems and containerised steam systems.
Customised steam solutions: Customisable to your requirements.
There’s no such thing as impossible. Whether you have special capacity requirements or special operating conditions – contact us in any case. We will find a solution. We promise!
Rent steam systems: Application examples
Seasonal demand
Our steam systems are ideal for seasonal requirements and help you to manage temporary peaks efficiently.
Production downtimes
Bridge production downtimes quickly and reliably with our rentable steam systems to minimise interruptions in your business.
Pilot projects
Use our steam systems for test runs and temporary projects to trial new processes without long-term investment.
Peak times
Manage additional steam demand at peak times with flexible rental solutions that are quickly available and easy to install.
Example projects of rental steam systems
Use by winemakers
For example, our steam systems support winegrowers with seasonal harvesting and processing, as they only have to clean the wine filter once a year.
Use on construction sites
In order to be able to continue construction work even at low temperatures, the temporary hire of steam systems in winter is a good option. For example, for gravel production sites that steam gravel piles in winter to prevent them from freezing.
Use by pharmaceutical companies
Pharmaceutical companies benefit from our steam systems for ensuring sterile production conditions and for carrying out temporary or scaled manufacturing processes.
Rental conditions for our steam systems
- The minimum hire period is 14 days and can be extended if required
- Installed and delivered ready for connection
- Start of hire: by arrangement
- End of hire: by agreement
- Delivery: by agreement
- Return transport: by agreement
- Instruction and commissioning of the steam system: by agreement
- A comprehensive functional and safety check is carried out every six months
- Burner adjustment to local conditions not included
- Invoicing is per calendar day based on the agreed hire period
On the ball:
Our customer service for rental steam systems.
On request, we can transport and install your system and put it into operation. You can also book regular maintenance.
By the way: In an emergency, a JUMAG rental steam boiler can be delivered on the same day and put into operation within 24 hours.
Our technical support is available around the clock in the event of problems or questions.
Rent steam! Request your individual rental offer.
The JUMAG rental process in detail
● Customised advice and preparation of a quotation.
● Cost calculation: rental costs, transport, maintenance costs.
For the successful commissioning of a fossil fuelled steam system, certain preparations must be made in advance.
● A suitable access road must be available so that the system can be unloaded and set up without any problems.
● Electrical systems require a three-phase connection with 400 V and 50 Hz as well as a 230 V AC 50 Hz power supply.
● Potential equalisation is also absolutely essential.
Before a steam system can be installed, various infrastructure requirements must be checked and prepared:
● Water supply: Ensuring a continuous supply of water
● Blow-down pipe: installation of a pipe for the safe discharge of waste products
● Steam and condensate lines: Laying pipes for steam and condensate
● Safety and ventilation pipework: Implementation of pipework for venting and safety
● Power supply: Ensuring a stable power supply
● Oil supply: Ensuring the oil supply for fossil fuels
● Connection of the flue gas stacks: Setting up the flue gas stacks for the system
We know: When you decide to hire a steam system, things have to happen quickly.
That's why at JUMAG you can count on delivery and commissioning at short notice.
Before the goods are dispatched, the system is fully checked by the quality assurance
and then delivered to you.
Hire steam systems: Application examples
- 2 x DG 560
- maximum steam output: 1120 kg/h / 380 kW per steam boiler
- maximum working pressure: 6 to 11 barÜ
- maximum operating pressure: 12 barÜ / max. permissible operating pressure 13 barÜ
- Operation with city water
- All media connections are on the outside of the container and easily accessible
- Container dimensions: L6000mm x W2500mm x H2900mm, approx. 8.0 tonnes
The maximum steam output is available at a feed water temperature of 95 °C
(possible with a corresponding amount of condensate). With a steam extraction
of 100%, steam is completely lost or absorbed in the product, the max. steam output is reduced by approx. 100 kW to approx. 1000 kg/h.
- Burner: Oil
- A required oil tank must be provided by the customer
- Feed water tank with steam preheating
- Blow-down/ flash vessel
- VDA 100 water softener
- Dosing pump (dosing liquid by arrangement)
- Steam dryer
- Pressure reducing station (for a working pressure < 6 barÜ > 1 barÜ) A safety valve is not included, please secure your consumers on site
- Container heating / lighting
- Chimney connector system (approx. 6 m effective height; approval via local chimney sweep)
Burner: Oil
A required oil tank must be provided by the customer.
Feed water tank with steam preheating
Blowdown/ expansion vessel
VDA 100 water softener
Dosing pump (dosing liquid by arrangement)
Steam dryer
Example 2 for a rental steam system: JUMAG containerised steam system CDA 1680
- 3 x DG 560 steam boilers with gas or oil firing
- Complete water treatment designed for 24/7 operation
- Feed water and condensate tank with degassing
- Blow-down vessel with integrated heat recovery
- Steam dryer
- Compressed air supply
- Frost protection
- Ventilation and deaeration
- Chimney
- Total steam output 1,680 kg/h (27.9 kg/min)
- Total heat load 1,200 kW
- Total heat output 1,140 kW
- Max. Operating pressure 13 barÜ/each boiler
- Working pressure 6 to 11 barÜ/per boiler
- Total max. oil throughput (11.8 kWh/Kg) 101 kg/h
- Total max. natural gas flow rate (10.35 kWh/m3) 115 m3/h
- Electrical connection 400 V / 50 Hz / per boiler
- Total electrical connected load 22 kW
- Total weight 13 tonnes
- Total width 8,500 mm
- Total height 2,580 mm
- Total depth 2,500 mm
- Chimney height (optionally extendable) 6,210 mm
A load-bearing and level floor is required.